Skip to content
VGIS® logo

Design & 3D visualisation · Core

Concept, design & working drawings

Architectural concept, design and full working drawings (architectural, mechanical, electrical) in 2–4 days, plus 3D visualisation, from VGIS in Abuja.

What is concept, design & working drawings?

VGIS takes a project from idea to buildable plans: concept, design and full working drawings covering architectural, mechanical and electrical, typically in 2–4 days. The same team then visualises the design in photorealistic 3D, typically in 2–5 days, so you can approve, present and market it before construction.

What you receive

  • Concept development
  • Architectural design
  • Architectural working drawings
  • Mechanical working drawings
  • Electrical working drawings
  • Optional: 3D visualisation of the design (full package)

Who it is for

  • Property owners and developers
  • Real estate companies
  • Hotels, commercial and institutional projects

Full plans typically in 2–4 days; 3D visualisation typically in 2–5 days.

Delivered from Abuja and Bida for clients in Nigeria, Canada, United States and Saint Lucia.

How it works

Concept to visualisation (full package)

From an idea to full plans in 2–4 days, then photorealistic 3D visualisation in 2–5 days.

  1. 01

    Concept

    We develop the concept from your brief, site and budget.

  2. 02

    Design

    We design the building: layouts, elevations and the look of the finished project.

  3. 03

    Working drawings

    We produce full architectural, mechanical and electrical working drawings, typically in 2–4 days.

  4. 04

    3D visualisation

    We turn the design into photorealistic renders, typically in 2–5 days.

  5. 05

    Delivery

    You receive the complete package: drawings for construction and visuals to approve, present and market.

Questions

Concept, design & working drawings: FAQ

Do you only visualise existing plans?

No. VGIS also does the concept, the design and the working drawings (architectural, mechanical and electrical). Some projects are the full package: design, drawings and 3D visualisation from one team.

How long does it take?

Full plans, from concept to working drawings, typically take 2–4 days. 3D visualisation typically takes 2–5 days. Timelines depend on the size and complexity of the project and are confirmed when we agree the scope.

Start a project

Bring your project to life before it is built.

Send your plans, drawings or brief. We will review the scope and reply with a plan and quote.